30T/h MVR Evaporation Crystallizer for Chemical Wastewater Treatment (ZLD)
| Steam Price | 200 | RMB/T | Working Time | 8000 | Hour/year | |||||||
| Circulation Cooling Water | l | RMB/m³ | Electrity Price | 1 | RMB/kW/h | |||||||
| Equipment | MVR Evaporator | Three effect evaporator | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Centrifugal compressor | 1300 | KW/h | 1300 | RMB | 0 | KW/h | 0 | RMB | ||
| Pump | 450 | KW/h | 450 | RMB | 400 | KW/h | 400 | RMB | ||
| Steam To Preheat | 0.5 | T/h | 100 | RMB | 12 | T/h | 12 | RMB | ||
| Cooling Water | 50 | T/h | 50 | RMB | 400 | T/h | 400 | RMB | ||
| etc. | 0 | 0 | RMB | 0 | 0 | RMB | ||||
| Evaporation Cost/ Hour | 1600 | RMB | 2840 | RMB | ||||||
| Evaporation Cost /Ton | 53.3 | RMB | 94.6 | RMB | ||||||
| Annual Operation Cost | 12800000 | RMB | 22720000 | RMB | ||||||
| Cost Saving/Ton | 41.3 | RMB | ||||||||
| Ratio of Economy Saving | 43% | |||||||||
3T/h MVR Falling Film Evaporator for Ethanol Extract Concentrating
| Operation Hours (H/Y) | 7200 | Electricity Price (USD/KW.h) | 0.12 | |
| Steam Price (USD/T) | 30 | Cooling Water Price (USD/T) | 0.015 | |
| Item | Multi-effect Evaporator | MVR Evaporator | ||
|---|---|---|---|---|
| Electricity (KW) | 25 | 95 | ||
| Live Steam (T/H) | 1.2 | 0.1 | ||
| Cooling Water (T/H) | 120 | 20 | ||
| Operation Cost per Hour (USD) | 40.8 | 14.7 | ||
| Cost of Evaporating one Ton of Water (USD) | 13.6 | 4.9 | ||
| Savings per Hour (USD) | 26.1 | |||
| Savings per Year (USD) | 187,920.0 | |||
| Savings Rate per Year | 64% | |||
Donkey-hide gelatin production evaporator
| Steam Price | 200RMB/T | Working Time | 8000Hours/year |
| Circulation Cooling Water | 1RMB/m³ | Electrity Price | 1RMB/Kw.h |
| Equipment | MVR Evaporator | Double-Effect Evaporator | ||||||
|---|---|---|---|---|---|---|---|---|
| Mechanical Compressor | 100 | KW/h | 100 | RMB | 0 | Kff/h | 0 | RMB |
| Pump | 24 | KW/h | 24 | RMB | 20 | KW/h | 20 | RMB |
| Steam To Preheat | 0.05 | T/h | 15 | RMB | 2. 28 | T/h | 457 | KMB |
| Cooling Water | 10 | T/h | 10 | RMB | 40 | T/h | 40 | KMB |
| etc. | 0 | 0 | RMB | 0 | 0 | RMB | ||
| Evaporation Cost/ Hour | 1-48 | RMB | 516 | RMB | ||||
| Evaporation Cost /Ton | 37 | RMB | 129 | RMB | ||||
| Annual Operation Cost | 1184000 | RMB | 4128000 | RMB | ||||
| Cost Saving/Ton | 92 | RMB | ||||||
| Ratio of Economy Saving | 70% | |||||||